Table of Contents
San Francisquito Creek Flood Control Long-term Options and CAP 205 Potential
Outline
Watershed dynamics
Flooding in 1998
SF Creek Flooding History
SF Creek Flow Frequencies
Outline
Criteria for flood control plans
Watershed dynamics
How can we control flood water?
Upstream estimates (CRMP* Report)
Upstream environmental challenges
Opportunity restatement
Outline
Simulation methodology
PPT Slide
Outline
3000 cfs Flow
4000 cfs Flow
5000 cfs Flow
6000 cfs Flow
7200 cfs Flow (1998 Flood Level)
Problems from man-made structures
~1928 creek re-routing
PPT Slide
PPT Slide
PPT Slide
PPT Slide
Chaucer/Pope in 1907
Chaucer/Pope rebuilt in 1948
Chaucer/Pope before & after
Outline
Example long-term plan to prevent 100-year floods
Bank Hgt Mods (+3 Ft) for 1998 Flood
Bank Hgt Mods (+3 Ft) ACoE 1% Flood
Outcomes of Long-Term Plan
Example of CAP 205 Subproject
CAP 205 outcome vs. 1998 flood
Outline
Crucial Strategy Decision
Crucial Actions Needed
|
Author: Thomas C. Rindfleisch
Email: tcr@Stanford.EDU